CO 115 in Fremont County and US 50 in Pueblo County Sign Replacement

Work this Week
March 27 - 31, 2023

For work this week, motorists should plan for:

  • Intermittent single lane closures US 50 from MP 316.1 to MP 329.8 7 between Pueblo and Avondale Monday through Friday from 7 a.m. to 6 p.m.
  • CO 115 from Mile Point 13.9 to MP 17.3 in Penrose no traffic impacts
  • Drivers are asked to obey the speed limit reductions and construction road signs during this time.

About the Project:

The Colorado Department of Transportation and contract partner Work Zone Traffic Control will begin a sign replacement project on CO 115 and US Highway 50 January 30. New signs will be installed along CO 115 from Mile Point 13.9 to MP 17.3 in Penrose and on US 50 from MP 316.1 to MP 329.8 between Pueblo and Avondale.

Work will include the removal of 450 worn out signs, installation of approximately 530 new signs, installation of new sign posts and upgrading delineators. The new signs will consist of speed limit, directional, street, mile point, guide, regulatory, and warning signs.

The new signs will be larger, have better reflectivity at night to help motorists navigate the highway safely and increase visibility of route-finding markers to increase drivers familiarity to the location of access points.


Work Schedule & Traffic Impacts

  • Motorists should plan for shoulder and single lane closures Monday through Friday from 7 a.m. to 5 p.m. The project is expected to last through June.

Project Facts

  • Cost: $900,000
  • Contractor:  Work Zone Traffic Control
  • Timeline: January 2023 - June 2023
  • Location: US 50 from between Pueblo and Avondale (MP 316.10 - 329.80) and CO 115 from MP 13.9 to MP 17.3 in Penrose

Pueblo County Sign project map

Click image to enlarge

Fremont county sign project map

Click image to enlarge