Project Suspended
This project has been suspended due to material shortages and is expected to resume in the fall of 2023. Barricades and fencing will remain in place at Chestnut Street and CO 145 intersections to protect the public. There will be no impacts to traffic or pedestrians during this suspension.
About the Project:
This project is located on US 160 in the City of Cortez, in Montezuma County. The project will consist of signal improvements at the intersection of US 160 and CO 145, as well as the intersection of US 160 and Chestnut Street. Work will include the replacement of old existing traffic Signals, poles and electronics.
Traffic signal improvements to these intersections will improve traffic flow for motorists and enhance pedestrian safety at crosswalks.
Project Benefits
- Traffic signal improvements to these intersections will improve traffic flow for motorists and enhance pedestrian safety at crosswalks.
Work Schedule:
- This project has been suspended due to material shortages and is expected to resume in the fall of 2023. Barricades and fencing will remain in place at Chestnut Street and CO 145 intersections to protect the public. There will be no impacts to traffic or pedestrians during this suspension.
Traffic Impacts:
Motorists can expect the following impacts during the period of construction:
- Vehicles, bikes and pedestrians should expect some travel impacts throughout the construction of this project.
- Motorists should be aware of lane closures and lane shifts in the intersections.
- Motorists are urged to watch for construction personnel and equipment in the work zone.
- Pedestrians can expect sidewalk closures.
- Some night work will be performed during this project.
Refer to COtrip.org for real-time travel conditions and road closures
Work this Week & Lane Closures
US 160 Cortez Signal Improvements
Project Facts
- Construction Cost: $1.6 Million
- Contractor: Bixby Electric
- Timeline: April - July 2023
- Location: Intersection of US 160/Chestnut Street and US 160/CO 145
- Cortez
- Mile Point(s): 38 - 41
- County: Montezuma