Facebook Pixel Image
Skip to content
Mobile CDOT Logo
  • Home
  • Travel
  • News
  • Safety
  • Performance
  • Business
  • Programs
  • Projects
  • About CDOT
  • A-Z A-Z
    • A
    • Annual Reports
    • K
    • KForms
CDOT Logo
Projects
You are here:
  1. Home
  2. Projects
  3. Studies
  4. Completed Studies
  5. US 6 Clifton Transportation Study
  6. Public Meeting #1, February 2015
Resources
  • Projects
  • Assets
  • Studies
    • US 24 West Finding of No Significant Impact (FONSI)
    • North I-25 PEL Study, US 36 to CO 7
    • US 34 & US 85 Interchange PEL Study
    • I-25 and Arapahoe Road/SH 88 Interchange Environmental Assessment & FONSI
    • I-25 Colorado Springs Area Finding of No Significant Impact (FONSI)
    • CO 7 Cherryvale to 75th Street EA & FONSI
    • US 34, US 287 to Larimer County Rd. 3 EA and FONSI
    • US 36 Managed Lanes - Investment Grade Traffic and Revenue Study
    • South I-25 Corridor and US 85 Corridor FEIS & ROD
    • US 6 - 24 Road to SH 139 Access Control Plan
    • US 6/River Front Road Access Control Plan in Silt
    • 2009 Disparity Study and Appendices
    • I-25 Valley Highway Environmental Impact Statement (EIS) and ROD
    • I-25, Colorado Springs to Monument Environmental Assessment
    • SH 42 Planning and Environmental Linkage Study (PEL)
    • US 40 Section 4(f) Evaluation
    • US 50 West Wills Blvd to McCulloch Blvd EA
    • US 50 West PEL Study
    • SH 60 Access Control Plan
    • SH 60 Environmental Overview Study
    • I-70/32nd Avenue Interchange Environmental Assessment
    • I-70 Mountain Corridor Mobility and Operational Assessment
    • I-70 Mountain Corridor Short Term Mobility Solutions Report
    • I-70 Reversible Lane Study
    • I-70 Reversible (Zipper) Lane Study Phase II
    • I-70 Twin Tunnels Environmental Assessment
    • SH 88/Federal Boulevard Environmental Assessment and FONSI
    • SH 133 Carbondale Access Control Plan
    • US 160 Durango to Bayfield Final EIS
    • US 160 Durango to Bayfield ROD October 2006
    • US 285 Environmental Assessment with Appendices
    • US 287 at Lamar Environmental Assessment and FONSI
    • US 287 Loveland to Fort Collins Environmental Overview Study (EOS)
    • US 287 from CO 1 to the LaPorte Bypass EA and FONSI
    • US 385 High Plains Corridor
    • SH 402 EA and FONSI
    • C-470 Environmental Assessment & FONSI 2015
    • Denver Area Regional Bus Facility Study
    • Devolution Study Report
    • Eastern Colorado Mobility Study
    • Northwest Corridor EIS
    • Ports to Plains
    • Region 3 Intersection Priority
    • Studies & Assessments
    • CO 119 Multi-modal Planning and Environmental Linkages Study
    • Completed Studies
      • CO 392 Environmental Overview Study (EOS)
      • US 6 Clifton Transportation Study
        • What is Planning and Environmental Linkages (PEL)?
        • Study Area
        • Study Schedule
        • Public Participation
        • Final Reports
        • Contact Us
        • Public Meeting #1, February 2015
          • 01 Study Area
          • 02 Purpose and Need
          • 03 Study Schedule
          • 04 PEL Study Process
          • 05 Previous Area Plans and Studies
          • 06 Existing and FutureTraffic Operations
          • 07 LOS Descriptions
          • 08 Multimodal Conditions
          • 09 Five Year Crash Summary
          • 10 Existing Roadway Conditions Study Area
          • 11 Existing Roadway Conditions US6 Focused Area
          • 12 Corridor Conditions and Potential Issues
          • 13 Built Environmental Conditions
          • 14 Natural Environmental Conditions
          • 15 Existing and Future Land Use
          • Clifton mtg #1 meeting overview
          • Clifton Pub Mtg #1 comment sheet
          • Clifton Q&A mtg #1
  • Flood-Related Projects
  • Central 70
  • Region 1 Denver Metro/Central Colorado Projects
  • Region 2 Southeastern Colorado Projects
  • Region 3 Northwestern Colorado Projects
  • Region 4 Northeastern Colorado Projects
  • Region 5 Southwestern Colorado Projects
  • CDOT Projects Overview
  • C470 - Wadsworth Boulevard to I-70 NEPA and Preliminary Design
  • I-25 (US 36 to 104th Ave) Improvements
  • CO 7 Lower (Lyons to Raymond)
  • Santa Fe Drive Action Plan- A Planning & Environmental Linkages (PEL) Study | C-470 to I-25
  • I-270 Corridor Improvements
  • Teller County
  • US 50 Bonforte to Avondale Resurfacing
  • Weld County ADA Ramps
  • US 285 Resurfacing between Monte Vista and Saguache
  • US 50 La Junta Microsurfacing
  • CO 82 - Paepcke Transit Hub Improvements in the City of Aspen on Main and Galena
  • Park County Chain-Up Stations
  • Eisenhower-Johnson Memorial Tunnels Infrastructure Repairs
  • ITS Installation of Road Side Connected Vehicles
  • CO 133 Bowie Chip Seal
  • I-70 Median Cable Rail in Eagle County
  • CO 115 Improvements - Colorado Springs to Penrose
  • CO 121/Wadsworth Signal Improvements in Jefferson County
  • Interstates
  • US Highways
  • State Highways
  • Denver Metro Area
  • Central/Eastern Colorado
  • Northeastern Colorado
  • Northwestern Colorado
  • Southeastern Colorado
  • Southwestern Colorado
  • I-70 Wildlife Fence in Eagle County
  • Southeastern Colorado Pavement Marking
  • CO 72 Frontage Road to Indiana Street Resurfacing
  • US 385 North of Cheyenne Wells
  • I-70 Wrong Way Detection Maintenance
  • US 85 Corridor Improvements
  • US 550 Chipeta Traffic Signal Installation
  • US 40 - Colfax and Quail Signal Replacement
  • CO 71 Bridge Repair Otero County
  • I-70 VSL and CO 74 & US 285 ITS Upgrades
  • US 160-CR 225 Intersection Improvements
  • I-76 Over Clear Creek Scour Mitigation
  • I-25 and CO-7: Interim Transit Improvements
  • CO 119 Boulder Canyon Tunnel Repairs
  • CO 52 Culvert Extension at Weld County Road 19
  • Clear Creek Scour Mitigation on I-70
  • I-70 Salt Wash Bridges Scour, Mesa County
  • US 34 Brush Lateral Canal Repair
  • C-470 Trail Bridge over Acres Green
  • US 287 & CO 52 Intersection Safety Improvements
  • I-25 & Alameda Bridge Replacement
  • CO 83 Douglas County Sign Replacement
  • US 85 at County Road 14.5 Intersection Improvements
  • I-70 Bridges over Ward Road
  • I-25 Concrete Panel Replacement
  • I-25 Walsenburg Bridge Replacement
  • Firestone-Longmont Mobility Hub
  • CO 12 Bridge Replacement in Las Animas County
  • CO 115 in Fremont County and US 50 in Pueblo County Sign Replacement
  • CO 207 & CO 266 Resurfacing
  • CO 74 Evergreen Lake North Trail
  • CO 109 Bridge over US 50, BNSF Railroad
  • US 24 Woodland Park Paving and ADA Curb Ramp Improvements
  • CO 21 and US 24 Signal Improvement Project in El Paso County
  • US 50 Passing Lane - Gunnison County
  • CO 72 Ignacio Resurfacing
  • US 50 & CO 71 Intersection Improvements
  • US 385 Holyoke North Resurfacing
  • CO 170 Critical Culverts, Boulder County
  • Drew Dix Parkway Dillon Drive at I-25 Interchange
  • Metro Denver Bridge Deck Safety Project
  • Southeast Colorado Guardrail Replacement
  • I-25 Re-Paving and Structural Repairs
  • CO 93 Resurfacing between US 6 and 58th Ave
  • CO 64 & CO 13 Meeker Resurfacing
Public Meeting #1, February 2015 https://expresslanes.codot.gov/projects/studies/study-archives/us6cliftonstudy/public-meeting-1-february-2015 https://expresslanes.codot.gov/@@site-logo/siteLogo.png

Public Meeting #1, February 2015

01 Study Area
02 Purpose and Need
03 Study Schedule
04 PEL Study Process
05 Previous Area Plans and Studies
06 Existing and FutureTraffic Operations
07 LOS Descriptions
08 Multimodal Conditions
09 Five Year Crash Summary
10 Existing Roadway Conditions Study Area
11 Existing Roadway Conditions US6 Focused Area
12 Corridor Conditions and Potential Issues
13 Built Environmental Conditions
14 Natural Environmental Conditions
15 Existing and Future Land Use
Clifton mtg #1 meeting overview
Clifton Pub Mtg #1 comment sheet
Clifton Q&A mtg #1

Tags:
  • Public Meeting
  • Project: US 6 Clifton Study
Need More Help?

Sign Up for Travel Alerts & News

CDOT Travel Alerts icon

Contact Us Contact Us Phone Icon 511 Icon
  • © 2022 State of Colorado
  • Accessibility
  • Privacy Statement
  • Security Statement
  • Transparency Online
Colorado Portal Logo