CO 66 Intersection Improvements in Northeastern Colorado/Region 4
Colorado Highways State Highways, Active Construction
About the Project:
CO 66 at Weld County Road (WCR) 7 and WCR 13 Intersection Improvements. This intersection improvement project includes two intersections. The traffic signal systems at both intersections will be replaced. Work at WCR 7 will also consist of adding a northbound left turn lane, and overlaying the entire intersection including new lanes a development is adding. The work will consist of minor earthwork, hot mix asphalt (HMA), traffic signals, bored conduit, signing, striping and traffic control.
Project Benefits
- Upgrades improve traffic flow for motorists and enhance pedestrian safety at crosswalks
- A new, smooth surface element that could be encountered by pedestrians that may cause trips or falls
Work Schedule:
- Construction will begin on October 16, 2023
- Working hours are Sunday through Monday from 8 p.m. to 5 a.m., and Tuesday through Thursday from 9 p.m. to 5 a.m.
- The project is anticipated to end in March 2024.
Traffic Impacts:
Motorists can expect the following impacts during the period of construction:
- Motorists should plan for 15-minute delays
- There will be a lane width restriction of 12 feet
- The speed limit will be reduced to 50 miles per hour (MPH) through the work zone
- Motorists are to follow directions from flaggers on-site
- Refer to COtrip.org for real-time travel conditions and road closures
Work this Week & Lane Closures CO 66 Intersection Improvements
Project Facts
- Construction Cost: $2.3 million
- Contractor: Brannan Sand & Gravel
- Timeline: October 16, 2023 to March 2024
- Location: Intersection at CO 66 and WCR 7 along with the intersection at CO 66 and Colorado Boulevard
- Nearest Town/City: Outside Longmont
- Mile Point(s): 41.36 to 45.10
- County: Weld