This project will reconstruct US 287 in concrete and improve drainage and shoulder embankments. The US 40/US 287 corridor between Campo and Hugo is one of Colorado's 28 high priority strategic projects.
ARRA Project Files
Installs a new traffic signal at this intersection.
Installs a new traffic signal at this intersection.
Chip seals 22 miles of US 36 to improve the roadway surface condition.
Replaces traffic signals at two locations.