ARRA Project Files

I-70 at Palisade Interchange (#42)

Improves safety by widening the acceleration and deceleration lanes at this interchange. The improvements will upgrade the interchange to current design standards.

I-25 Through Trinidad

Constructs the Purgatoire River Pedestrian Trail, adds street lights, parking lot paving, curb and gutter, drainage inlets, landscaping and sidewalk. This work will be added onto the existing contract for work taking place on I-25 through Trinidad.

State Highway 340 in Fruita

Installs two new traffic signals west of the I-70 interchange and makes intersection safety improvements for pedestrians and vehicles.

US 40/US 287 at Boyero

This is the next phase of a concrete reconstruction project along this corridor. The project will improve 8.7 miles of US 40/US 287 (mileposts 413-422 approximately). The US 40/US 287 corridor between Campo and Hugo is one of Colorado's 28 high priority strategic projects.

US 285 at Shaffers Crossing

This is the next phase of a concrete reconstruction project along this corridor. The project will improve 8.7 miles of US 40/US 287 (mileposts 413-422 approximately). The US 40/US 287 corridor between Campo and Hugo is one of Colorado's 28 high priority strategic projects.