Designs and constructs a transportation museum.
ARRA Project Files
Constructs a flyover ramp from southbound Santa Fe Drive to eastbound C-470 to improve safety and mobility.
Paves 2.88 miles of the existing 4.88 mile trail in asphalt.
Repairs or replaces concrete slabs for approximately three miles of I-70.
Pedestrian trail replacement and streetscape on Northern Avenue from Vinewood Lane to Prairie Avenue.
Resurfaces seven miles of the Platte River pedestrain/bicycle path.
Landscaping and irrigation installation for the Eastern Gateway Landscape project located at the intersection of US 50B and SH 47.
Resurfaces 2.4 miles in asphalt.
Restores the roundhouse to become a railroad museum.
Resurfaces 10.8 miles of US 24 in asphalt.
Chip seals 15 miles of US 34.
Widens one mile of US 85 to two lanes in each directions with shoulders and a raised median with controlled access. The existing roadway is only one lane in each direction with no shoulders.
Repairs or replaces concrete slabs on C-470 and resurfaces C-470 in asphalt. Rehabilitates the C-470 bike path between I-70 and I-25.
Reconstructs five miles of CO 13 in asphalt, adds eight-foot shoulders and climbing and passing lanes. The improvements will enhance recreational bicycling in this area. This is the first phase of a larger project to improve CO 13 between Rifle and Meeker. Keywords: State Highways
Documents for ARRA projects
Resurfaces approximately three miles of I-25 in asphalt.
Installs ramp metering on the ramps from Sheridan Blvd. to westbound US 36, 84th Ave. to northbound I-25, Kipling Parkway to eastbound C-470 and Yosemite St. to westbound C-470.
Replaces the Alameda bridge over I-25 with one that is wider to accommodate an additional lane in each direction.
Improves five miles of roadway surface on I-25.
This safety improvement project will upgrade traffic signals and improve ramp width and length to benefit both pedestrians and vehicles.