Facebook Pixel Image
Skip to content
Mobile CDOT Logo
  • Home
  • Travel
  • News
  • Safety
  • Performance
  • Business
  • Programs
  • Projects
  • About CDOT
  • A-Z A-Z
    • A
    • Annual Reports
    • K
    • KForms
CDOT Logo
Projects
You are here:
  1. Home
  2. Projects
  3. Archived Project Sites
  4. State Highway 7 (Arapahoe Road) Environmental Assessment
  5. SH 7 (Arapahoe Rd.) Environmental Assessment
SH 7 (Arapahoe Rd.) Environmental Assessment https://expresslanes.codot.gov/projects/archived-project-sites/SH7EA/environmental-assessment.html https://expresslanes.codot.gov/@@site-logo/siteLogo.png

SH 7 (Arapahoe Rd.) Environmental Assessment

Finding of No Significant Impact and Final Section 4(f) Evaluation

SH 7 FONSI and Final 4(f) Report

SH 7 FONSI and Final 4(f) Appendices

Environmental Assessment

SH 7 – Cherryvale Road to 75th Street Environmental Assessment (6MB)
Summary – Introduction, Table of Contents and Executive Summary
Chapter 1 – Purpose and Need
Chapter 2 – Alternatives
Chapter 3 – Affected Environment and Environmental Consequences
Chapter 4 – Section 4(f) Evaluation
Chapter 5 – Public Participation

Environmental Assessment Appendices (57MB)(Includes all appendices below)

Appendix A - Preliminary Alternatives

Appendix E - Noise Analysis

Appendix B - Preferred Alternative

Appendix F - Air Quality Analysis

Appendix C - Preferred Railroad Alternative

Appendix G - Agency Coordination (9MB)

Appendix D - Wetland Finding

Appendix H - Public Coordination (22MB)


Tags:
  • Projects
Contact Information

Jared Fiel
CDOT Communications Manager 
[email protected]
970-350-2217

Contact Us Contact Us Phone Icon 511 Icon
  • © 2022 State of Colorado
  • Accessibility
  • Privacy Statement
  • Security Statement
  • Transparency Online
Colorado Portal Logo