Thanks to the funding provided by the legislature through SB 262, SB 1 and SB 267, CDOT is able to implement a portion of the 10-Year Strategic Project Pipeline. The following project lists identify the funded and unfunded projects CDOT is proposing, along with how each project addresses the concerns raised by Coloradans. Improving safety is a component of every project.
Interactive Project Map Instructions
-
Accessing the Legend: Select a project line or point to open a screen with more information about that project. To access the legend, select the button with the two arrows on the right for a key of symbols on the map. A window like the one to the right will display.
-
Using the Map: To navigate around the map, select and drag your mouse around to move the map. Mobile users, touch and drag to move the map.
-
Zooming In/Out: To zoom in and out, users can use the + and – buttons seen in the tool below. PC users may also use the scroll wheel on their mouse. Mobile users use two fingers to zoom in and out. The home button in the tool seen below will zoom back to the original extent.
Highways |
Project Cost |
Project ID |
Improving Interstates |
Relieving Traffic |
Improving Rural Access |
Fixing Rural Roads |
Improving Roadway System Condition |
I-25 Interchange Reconstruction at Speer Boulevard & 23rd Avenue |
$25M |
2575 |
|
|
|
|
|
I-25 Valley Highway Phases 3 & 4 (Burnham Yard) |
$200M |
2576 |
|
|
|
|
|
I-25 North between 84th Avenue & 104th Avenue, Early Action Items |
$70M |
2584 |
|
|
|
|
|
I-25 & CO 7 Interchange Mobility Hub |
$5M |
2694 |
|
|
|
|
|
I-25 at Belleview Avenue Interchange, Phase 1 |
$22M |
2588 |
|
|
|
|
|
I-70 Westbound at Floyd Hill |
$100M |
2577 |
|
|
|
|
|
I-70 & Kipling Street Interchange Right-of-Way |
$30M |
2580 |
|
|
|
|
|
I-70 Climbing Lane from Bakerville to the Eisenhower Tunnel |
$25M |
2582 |
|
|
|
|
|
Eisenhower-Johnson Memorial Tunnels Maintenance |
$50M |
2583 |
|
|
|
|
|
I-70 Escape Ramp Improvements |
$5M |
2593 |
|
|
|
|
|
Vasquez Boulevard Improvements |
$10M |
2585 |
|
|
|
|
|
US 6 & Wadsworth Boulevard Interchange |
$70M |
2578 |
|
|
|
|
|
US 85 Corridor Improvements between Sedalia & The Meadows in Castle Rock |
$37M |
2587 |
|
|
|
|
|
US 285 Corridor Improvements near Pine Junction |
$60M |
2581 |
|
|
|
|
|
CO 7 Priority Intersection Improvements |
$15M |
2586 |
|
|
|
|
|
C-470: US 285 to Morrison Road Interchange Reconstruction and Widening |
$56M |
2579 |
|
|
|
|
|
CO 30 Improvements between Quincy Road & Airport Road |
$25M |
2589 |
|
|
|
|
|
Vision Zero Priority Improvements |
$10M |
2691 |
|
|
|
|
|
Regionwide Bottleneck Reduction |
$25M |
2590 |
|
|
|
|
|
Regionwide Signal Cabinet Upgrades |
$5M |
2591 |
|
|
|
|
|
Regionwide Signal Upgrades |
$12M |
2592 |
|
|
|
|
|
Noise Wall Maintenance |
$10M |
2594 |
|
|
|
|
|
Regionwide Trail Grade Separations & Crossings Improvements |
$10M |
2595 |
|
|
|
|
|
Regionwide Bridge Rehab/Maintenance |
$45M |
2697 |
|
|
|
|
|
Transit |
Project Cost |
Project ID |
Improving Interstates |
Relieving Traffic |
Improving Rural Access |
Fixing Rural Roads |
Improving Roadway System Condition |
I-25 North between 84th Avenue & 104th Avenue, Early Action Items |
$40M |
2642 |
|
|
|
|
|
I-25 and CO 7 Interchange Mobility Hub |
$5M |
2694 |
|
|
|
|
|
CO 7 Priority Intersection Improvements |
$5M |
2641 |
|
|
|
|
|
Regionwide Arterial Transit Improvements |
$70M |
2638 |
|
|
|
|
|
I-25 DTC Mobility Hub |
$10M |
2639 |
|
|
|
|
|
I-70 Morrison Mobility Hub |
$20M |
2640 |
|
|
|
|
|
NOTE: Safety is fundamental to every project, so while a specific category has been hidden from the table, safety always applies. For the purposes of this document, “funded” projects are those identified to receive funding from one or more sources provided by the state legislature (i.e., Senate Bill 1, Senate Bill 262, Senate Bill 267). CDOT has not yet received all of these dollars as they are subject to future year appropriations. Projects identified as “unfunded” have no funding source currently identified. |
|
|
|
|
|
|
|
Highways |
Project Cost |
Project ID |
Improving Interstates |
Relieving Traffic |
Improving Rural Access |
Fixing Rural Roads |
Improving Roadway System Condition |
US 24 Shoulder Widening |
$10M |
1642 |
|
|
|
|
|
US 50 Passing Lanes East of Salida |
$8.5M |
1009 |
|
|
|
|
|
CO 67 Passing Lanes |
$10.5M |
1010 |
|
|
|
|
|
CO 69 Shoulder & Safety Improvements |
$10M |
2567 |
|
|
|
|
|
CO 96 Shoulder Widening |
$10.5M |
1665 |
|
|
|
|
|
CO 115 Shoulders & Safety Improvements |
$10.5M |
1080 |
|
|
|
|
|
I-25C & US 160 Intersection Improvements |
$4M |
1502 |
|
|
|
|
|
US 160 Freight & Safety Improvements |
$18M |
1508 |
|
|
|
|
|
US 350 Shoulder Widening & Safety Improvements |
$5.5M |
1511 |
|
|
|
|
|
Southern Mountain Loop Trail |
$10M |
1039 |
|
|
|
|
|
CO 12 ADA Ramps & Sidewalk Improvements in La Veta & Trinidad |
$1M |
1493 |
|
|
|
|
|
CO 69 Safety Improvements |
$6.2M |
1037 |
|
|
|
|
|
US 50 Passing Lanes between Fowler & Kansas State Line |
$15M |
1614 |
|
|
|
|
|
Realign US 50 as a Part of US 287 Reliever Route Project |
$34.2M |
1617 |
|
|
|
|
|
US 160 Curve Alignment |
$1M |
1628 |
|
|
|
|
|
Passing Lanes on US 385 |
$5M |
1631 |
|
|
|
|
|
CO 10 Shoulder Widening |
$10M |
1626 |
|
|
|
|
|
CO 71 Passing Lanes |
$4M |
1633 |
|
|
|
|
|
CO 96 & CO 71 Intersection Improvements |
$800K |
1625 |
|
|
|
|
|
US 24 – East Widening |
$46M |
2548 |
|
|
|
|
|
US 24 West over Ridge Road (Overpass) |
$16M |
2549 |
|
|
|
|
|
CO 21 & Airport Road DDI Interchange Construction |
$45M |
2547 |
|
|
|
|
|
I-25 HOV Lanes in Colorado Springs |
$55M |
2702 |
|
|
|
|
|
High-Capacity Corridor Improvements in El Paso County |
$85K |
2552 |
|
|
|
|
|
BNSF Corridor Purchase for Multimodal Facilities |
$1.1M |
2553 |
|
|
|
|
|
I-25 Improvements between 13th Street & US 50 |
$28M |
2560 |
|
|
|
|
|
I-25 Exit 108 (Purcell Boulevard) Replace Single Box Culvert Crossing Under I-25 |
$11M |
2562 |
|
|
|
|
|
I-25 at Exit 104 - Dillon Drive Improvements |
$3M |
2565 |
|
|
|
|
|
Business US 50 Drainage Improvements at 36th Lane |
$5.5M |
2563 |
|
|
|
|
|
CO 45 – North Extension Study |
$1M |
2564 |
|
|
|
|
|
CO 47 Four-Lane Extension to US 50 |
$8M |
2561 |
|
|
|
|
|
CO 96 – West of Pueblo |
$11.5M |
2559 |
|
|
|
|
|
US 160 Trinchera Ranch Safety & Wildlife Mitigation |
$15.95M |
1315 |
|
|
|
|
|
Transit |
Project Cost |
Project ID |
Improving Interstates |
Relieving Traffic |
Improving Rural Access |
Fixing Rural Roads |
Improving Roadway System Condition |
Transfer Facilities for Regional Transit Services (Cripple Creek, Cañon City, Woodland Park) |
$390K |
1004 |
|
|
|
|
|
New Regional Fixed-Route Transit Service in Teller County |
$600K |
1068 |
|
|
|
|
|
Expanded Golden Shuttle Fixed-Route Service in Fremont County |
$1.33M |
1070 |
|
|
|
|
|
Expanded Local Fixed-Route Service between Florence-Penrose-Cañon City |
$760K |
1071 |
|
|
|
|
|
Cripple Creek Administration and Operations Facility |
$2.05K |
1075 |
|
|
|
|
|
Westcliffe Vehicle Housing |
$460K |
1079 |
|
|
|
|
|
Mobility Management & Expansion of Upper Arkansas Area Council of Governments (UAACOG) |
$100K |
1635 |
|
|
|
|
|
New Interregional Transit Service between Cañon City-Florence-Colorado Springs |
$840K |
1081 |
|
|
|
|
|
Kim Transit Garage |
$500K |
1044 |
|
|
|
|
|
Expanded Regional Transit Service for Branson, Kim, & Baca County |
$600K |
1045 |
|
|
|
|
|
Expanded Regional Transit Service between Walsenburg-La Veta-Gardener-Cuchara |
$1.4M |
1038 |
|
|
|
|
|
Expanded Regional Transit Service between Trinidad and CO 12 Communities |
$2M |
1267 |
|
|
|
|
|
La Junta Multimodal Transit Center |
$4M |
1285 |
|
|
|
|
|
La Junta to Fowler Fixed-Route Service |
$600K |
1287 |
|
|
|
|
|
City of La Junta Bus Barn Rehabilitation |
$200K |
1288 |
|
|
|
|
|
Expand Deviated Fixed-Route Services in La Junta |
$400K |
1289 |
|
|
|
|
|
Prowers Area Transit Bus Barn Expansion |
$150K |
2487 |
|
|
|
|
|
Baca County Bus Facility |
$400K |
1048 |
|
|
|
|
|
Kiowa County Bus Storage Facility |
$200K |
1281 |
|
|
|
|
|
Expand Crowley County Transit Service in Crowley County and Sugar City |
$400K |
1294 |
|
|
|
|
|
Expanded Regional Transit Service in Kiowa County |
$400K |
1047 |
|
|
|
|
|
US 50+B83:B98 between Penrose & the Fremont/Pueblo County Line |
$500K |
1049 |
|
|
|
|
|
Bustang Mobility Hub in Fountain |
$8.2M |
2073 |
|
|
|
|
|
Mountain Metropolitan Transit Fixed-Route Service Expansion (Stage 1) |
$7.8M |
2556 |
|
|
|
|
|
Pueblo Transit Fixed-Route Bus/Vehicle Replacements |
$7.24M |
2566 |
|
|
|
|
|
Fixing Rural Roads |
Project Cost |
Project ID |
Improving Interstates |
Relieving Traffic |
Improving Rural Access |
Fixing Rural Roads |
Improving Roadway System Condition |
US 50 between Penrose & the Fremont/Pueblo County Line |
$9.14M |
2607 |
|
|
|
|
|
CO 115 between Canon City & US 50 |
$8.01M |
2608 |
|
|
|
|
|
US 285 South of Bailey to Park/Jefferson County Line |
$6.85M |
2609 |
|
|
|
|
|
US 24 between Trout Creek Pass & Hartsel |
$7.14M |
2610 |
|
|
|
|
|
US 24 Hartsel to east of Wilkerson Pass |
$9.83M |
2611 |
|
|
|
|
|
US 24 East of Wilkerson Pass to Lake George |
$3.29M |
2612 |
|
|
|
|
|
US 24 between Lake George & Divide |
$5.13M |
2613 |
|
|
|
|
|
CO 67 between Florence and US 50 |
$2M |
2614 |
|
|
|
|
|
SH 120 East of Florence to US 50 |
$2.9M |
2615 |
|
|
|
|
|
I-25 Business Route through Walsenburg |
$2.83M |
2616 |
|
|
|
|
|
US 160 Walsenburg West |
$1.92M |
2617 |
|
|
|
|
|
CO 10 Walsenburg East |
$7.85M |
2618 |
|
|
|
|
|
CO 12 Junction US 160 South |
$2.81M |
2619 |
|
|
|
|
|
CO 12 East of Valdez to Trinidad |
$6.26M |
2620 |
|
|
|
|
|
US 160 between North La Veta Pass & Junction SH 12 |
$3.54M |
2621 |
|
|
|
|
|
US 160 between I-25 Business Rout (Walsenburg) & I-25 |
$640K |
2622 |
|
|
|
|
|
CO 389 between CO/NM State Line & Junction US 160 |
$5.28M |
2623 |
|
|
|
|
|
CO 10 Otero/Pueblo County Line East |
$1.56M |
2624 |
|
|
|
|
|
CO 101 between Las Animas & Toonerville |
$9.83M |
2625 |
|
|
|
|
|
CO 160 between Pritchett & Kim |
$11.72M |
2626 |
|
|
|
|
|
CO 350 between La Junta & Delhi |
$7.55M |
2627 |
|
|
|
|
|
US 385 North of Sheridan Lake to Kiowa/ Cheyenne County Line |
$4.96M |
2628 |
|
|
|
|
|
US 385 between Granada & Junction CO 96 |
$13.19M |
2629 |
|
|
|
|
|
Highways |
Project Cost |
Project ID |
Improving Interstates |
Relieving Traffic |
Improving Rural Access |
Fixing Rural Roads |
Improving Roadway System Condition |
US 50 Asset Management North of Montrose |
$15M |
1462 |
|
|
|
|
|
US 50 Safety East of Gunnison |
$15M |
1469 |
|
|
|
|
|
CO 92 Safety Improvements West of Hotchkiss |
$25M |
1107 |
|
|
|
|
|
Shoulder Improvements in the Gunnison Valley Transportation Planning Region |
$13.6 |
1484 |
|
|
|
|
|
I-70 Glenwood Canyon Critical Asset Repair |
$11M |
1151 |
|
|
|
|
|
I-70 West: Dowd Canyon Interchange |
$14M |
1154 |
|
|
|
|
|
I-70 and CO 9 (Exit 203) Interchange Improvements |
$30M |
1157 |
|
|
|
|
|
I-70 West Vail Pass Auxiliary Lanes |
$50M |
1161 |
|
|
|
|
|
I-70 Interchange Improvements in Garfield County |
$15M |
1171 |
|
|
|
|
|
US 24 Safety Improvements between Minturn and Leadville |
$9.6M |
1203 |
|
|
|
|
|
US 40 Capacity Improvements |
$20M |
1259 |
|
|
|
|
|
US 40 Shoulder Improvements West of Kremmling |
$21M |
1258 |
|
|
|
|
|
US 34 and US 40 |
$5M |
1697 |
|
|
|
|
|
US 40 – North of CO 134 |
$8.7M |
1710 |
|
|
|
|
|
US 40 Passing Lanes between Craig and Steamboat Springs |
$8M |
1712 |
|
|
|
|
|
US 40 and Downhill Drive Intersection Improvements |
$6.5M |
1729 |
|
|
|
|
|
I-70 Business (Pitkin Avenue) Corridor Improvements between First Street and 15th Street |
$18M |
2568 |
|
|
|
|
|
I-70 Business Corridor Improvements between 32 Road and I-70 in Grand Junction |
$5M |
2569 |
|
|
|
|
|
I-70 Business Corridor Improvements between Main Street and 32 Road |
$14M |
2570 |
|
|
|
|
|
US 6 Corridor Improvements in Mesa County |
$13M |
2571 |
|
|
|
|
|
CO 141 (32 Road) Safety and Capacity Improvements |
$15M |
2573 |
|
|
|
|
|
CO 340 Safety Improvements |
$9M |
2572 |
|
|
|
|
|
Shoulder Improvements in Mesa County |
$1.5M |
2574 |
|
|
|
|
|
Transit |
Project Cost |
Project ID |
Improving Interstates |
Relieving Traffic |
Improving Rural Access |
Fixing Rural Roads |
Improving Roadway System Condition |
Regional Transit Service between Montrose and Telluride |
$1.2M |
1028 |
|
|
|
|
|
New Regional Transit Service between Montrose and Delta |
$200K |
1098 |
|
|
|
|
|
New Interregional Transit Service between Montrose and Grand Junction |
$200K |
1101 |
|
|
|
|
|
New Demand Response Human Services Transportation in Hinsdale County |
$150K |
1127 |
|
|
|
|
|
Vail Intermodal Site |
$15M |
1903 |
|
|
|
|
|
Snowmass Transit Center |
$4M |
1231 |
|
|
|
|
|
New Essential Bus Service between Grand Junction and Craig and between Craig and Frisco (Proposed Bustang Outrider Service) |
$400K |
1032 & 2125 |
|
|
|
|
|
Steamboat Springs Transit Fleet Expansion |
$2.4M |
1245 |
|
|
|
|
|
Redesign and Construct the Steamboat Springs Transportation Center (Phase 1) |
$2.3M |
1246 |
|
|
|
|
|
Steamboat Springs Bus Rapid Transit Planning Study |
$250K |
1254 |
|
|
|
|
|
Grand Valley Transit Bus Replacement |
$2M |
2666 |
|
|
|
|
|
Grand Valley Transit System Enhancements |
$1.24M |
2667 |
|
|
|
|
|
Grand Valley Transit Maintenance Facility |
$1.5M |
2668 |
|
|
|
|
|
Grand Valley Transit Compressed Natural Gas Storage and Production Facility |
$540K |
2669 |
|
|
|
|
|
Fixing Rural Roads |
Project Cost |
Project ID |
Improving Interstates |
Relieving Traffic |
Improving Rural Access |
Fixing Rural Roads |
Improving Roadway System Condition |
US 50 south of Delta |
$5.17M |
2654 |
|
|
|
|
|
US 50 south of Olathe |
$4.07M |
2657 |
|
|
|
|
|
US 50 Olathe Business Loop |
$1.12M |
2663 |
|
|
|
|
|
CO 65 Between SH 92 and Orchard City |
$5.67M |
2645 |
|
|
|
|
|
CO 65 Grand Mesa |
$6.63M |
2651 |
|
|
|
|
|
CO 90 west of Montrose |
$3.64M |
2661 |
|
|
|
|
|
CO 90 west of Montrose |
$780K |
2662 |
|
|
|
|
|
CO 92 between SH 65 and Austin |
$2.41M |
2658 |
|
|
|
|
|
CO 135 south of Crested Butte |
$6.82M |
2648 |
|
|
|
|
|
CO 348 between Olathe and US 50 |
$800K |
2664 |
|
|
|
|
|
CO 348 west of Olathe |
$1.77M |
2665 |
|
|
|
|
|
CO 9 south of Green Mountain Reservoir |
$7.65M |
2644 |
|
|
|
|
|
CO 9 Green Mountain Reservoir (Phase 1) |
$7.18M |
2647 |
|
|
|
|
|
CO 9 Green Mountain Reservoir (Phase 2) |
$5.75M |
2650 |
|
|
|
|
|
US 40 east of Hayden (Phase 1) |
$5.72M |
2643 |
|
|
|
|
|
US 40 east of Hayden (Phase 2) |
$4.86M |
2646 |
|
|
|
|
|
US 40 west of Tabernash |
$7.15M |
2653 |
|
|
|
|
|
CO 64 east of Rangely |
$4.5M |
2659 |
|
|
|
|
|
CO 125 north of Walden |
$5.55M |
2656 |
|
|
|
|
|
CO 139 between the Garfield/Rio Blanco County Line and Douglas Creek |
$6.78M |
2652 |
|
|
|
|
|
CO 139 between Douglas Creek and Rangely |
$7.09M |
2655 |
|
|
|
|
|
CO 125 south of Cowdrey to SH 127 |
$6.42M |
2660 |
|
|
|
|
|
CO 318 between the Colorado/Utah State Line and Sunbeam |
$6.74M |
2649 |
|
|
|
|
|
Highways |
Project Cost |
Project ID |
Improving Interstates |
Relieving Traffic |
Improving Rural Access |
Fixing Rural Roads |
Improving Roadway System Condition |
I-70 Arriba Rest Area |
$2M |
1572 |
|
|
|
|
|
I-70 Bridges near Limon |
$4.28M |
2670 |
|
|
|
|
|
Resurfacing select segments of I-70 between Seibert and Stratton |
$28.72M |
2684 |
|
|
|
|
|
I-76 Corridor Improvements and Preservation |
$26.48M |
1022 |
|
|
|
|
|
I-76 east of Sterling (Part 2 Slabs and Diamond Grind) |
$8.25M |
2683 |
|
|
|
|
|
I-76 Atwood |
$270K |
2671 |
|
|
|
|
|
US 40/US 287 – Between Limon and Kit Carson |
$2M |
1017 |
|
|
|
|
|
US 40 – Wild Horse |
$820K |
2672 |
|
|
|
|
|
US 40/US 287 Passing Lanes |
$1.68M |
2673 |
|
|
|
|
|
US 385 Burlington |
$170K |
2678 |
|
|
|
|
|
US 385 Idalia North |
$10K |
2679 |
|
|
|
|
|
CO 59 Bridges |
$1.29M |
2675 |
|
|
|
|
|
CO 59 Siebert to Cope |
$1.18M |
2677 |
|
|
|
|
|
CO 71 Limon Structures |
$620K |
2680 |
|
|
|
|
|
CO 86 Corridor Improvements |
$2M |
2413 |
|
|
|
|
|
CO 59 Sandy Creek Bridge |
$5.42M |
2674 |
|
|
|
|
|
Six Mile Creek |
$380K |
2676 |
|
|
|
|
|
I-76 Reconstruction from Fort Morgan to Brush |
$45M |
1430 |
|
|
|
|
|
US 85 Frontage Road Improvements |
$10M |
1443 |
|
|
|
|
|
US 287 Passing Lanes and Safety Improvements |
$20M |
1456 |
|
|
|
|
|
CO 71 Stoneham |
$140K |
2682 |
|
|
|
|
|
CO 71 Big Beaver Creek |
$4.78M |
2681 |
|
|
|
|
|
North I-25 Express Lanes from CO 56 to CO 66 |
$196.4M |
2603 |
|
|
|
|
|
US 36/28th Street and CO 93/Broadway Intersection Improvements |
$10.12M |
2597 |
|
|
|
|
|
US 85 Corridor Improvements, Brighton to Fort Lupton |
$6.1M |
2600 |
|
|
|
|
|
US 287 Corridor Improvements: US 36 to CO 66 |
$25M |
2602 |
|
|
|
|
|
CO 7 Corridor Improvements |
$9M |
2596 |
|
|
|
|
|
CO 42 Safety and Intersection Improvements |
$14M |
2598 |
|
|
|
|
|
CO 66 Corridor Improvements |
$10M |
2599 |
|
|
|
|
|
CO 119 Bus Rapid Transit (BRT) and Managed Lanes |
$20M |
2601 |
|
|
|
|
|
I-25 and CO 14 Interchange Improvements |
$30.5M |
2604 |
|
|
|
|
|
US 85 and US 34 Interchange |
$33M |
2695 |
|
|
|
|
|
Transit |
Project Cost |
Project ID |
Improving Interstates |
Relieving Traffic |
Improving Rural Access |
Fixing Rural Roads |
Improving Roadway System Condition |
New Essential Bus Service between Limon and Denver |
$1.08M |
1016 |
|
|
|
|
|
Essential Bus Service between Burlington and Denver |
$2.42M |
1094 |
|
|
|
|
|
North I-25 Transit Service |
$1.55M |
1802 |
|
|
|
|
|
New Local Fixed-Route Transit Service in Fort Morgan |
$1.55M |
1426 |
|
|
|
|
|
Estes Park Transit Electric Trolley Bus Barn |
$320K |
2525 |
|
|
|
|
|
Estes Park Transit Electric Trolley Charging Station |
$10K |
2526 |
|
|
|
|
|
Estes Park Transit Stop Improvements |
$150K |
2527 |
|
|
|
|
|
Public Restrooms at the Transit Hub and Events Complex Park-n-Ride in Estes Park |
$400K |
2529 |
|
|
|
|
|
Parking Lot Reconfiguration at the Visitor Center and Transit Transfer Center in Estes Park |
$1.04M |
2530 |
|
|
|
|
|
CO 7 Corridor Improvements |
$6.3M |
2596 |
|
|
|
|
|
US 36/28th Street and SH 93/Broadway Intersection Improvements |
$5M |
2597 |
|
|
|
|
|
US 287 Corridor Improvements: US 36 to CO 66 |
$5M |
2602 |
|
|
|
|
|
CO 119 Bus Rapid Transit (BRT) and Managed Lanes |
$4.88M |
2601 |
|
|
|
|
|
Mobility Hubs in CDOT Region 4 |
$6M |
2606 |
|
|
|
|
|
Bustang Service in Region 4 |
$5.4M |
2690 |
|
|
|
|
|
Transit Service between Loveland and Greeley |
$13.2M |
2605 |
|
|
|
|
|
Fixing Rural Roads |
Project Cost |
Project ID |
Improving Interstates |
Relieving Traffic |
Improving Rural Access |
Fixing Rural Roads |
Improving Roadway System Condition |
US 385 Corridor Study Improvements |
$35.28M |
2416 |
|
|
|
|
|
US 385 between Sand Creek and County Road 29 |
$14.69M |
2685 |
|
|
|
|
|
US 385 south of Cheyenne Wells |
$12.32M |
2686 |
|
|
|
|
|
US 385 south of Julesburg |
$11.55M |
2687 |
|
|
|
|
|
CO 59 Safety Improvements |
$29.26M |
2498 |
|
|
|
|
|
CO 71 Corridor Improvements |
$27.38M |
1023 |
|
|
|
|
|
CO 71 south of SH 14 |
$24.13M |
2688 |
|
|
|
|
|
CO 71 north of Brush |
$3.48M |
2689 |
|
|
|
|
|
Highways |
Project Cost |
Project ID |
Improving Interstates |
Relieving Traffic |
Improving Rural Access |
Fixing Rural Roads |
Improving Roadway System Condition |
US 550 Shoulder Improvements, Deer Fencing, and Animal Underpass |
$30.57M |
1133 |
|
|
|
|
|
Multimodal Improvements on CO 145 |
$5M |
1482 |
|
|
|
|
|
US 24 Intersection Improvements in Buena Vista |
$8M |
2039 |
|
|
|
|
|
Intersection and Pedestrian Improvements at SH 291 and US 50 |
$2.5M |
2070 |
|
|
|
|
|
US 50 Corridor Improvements in Poncha Springs |
$2M |
2456 |
|
|
|
|
|
US 160 Multimodal Improvements in Alamosa |
$8.8M |
2038 |
|
|
|
|
|
Intersection Improvements at US 160 and Pike Avenue |
$3M |
2061 |
|
|
|
|
|
US 285 Safety and Mobility Improvements between Center and Saguache |
$33.68M |
1051 |
|
|
|
|
|
US 285 Improvements in Saguache |
$750K |
2069 |
|
|
|
|
|
CO 112 Pedestrian Crossing in Center |
$750K |
2050 |
|
|
|
|
|
US 160 Intelligent Transportation Systems (ITS) Infrastructure |
$3.56M |
1303 |
|
|
|
|
|
US 160 Elmore’s Corner East |
$34.53M |
1334 |
|
|
|
|
|
Pagosa Springs’ Main Street Reconstruction and Multimodal Improvements |
$13.67M |
1339 |
|
|
|
|
|
Intersection Improvements at US 160 and CR 30.1 (Phil’s World) |
$1.5M |
2087 |
|
|
|
|
|
Wildlife Mitigation on US 160 between Cortez and Durango (near CR 30.1) |
$2.88M |
2089 |
|
|
|
|
|
US 160 and CR 225 Intersection Improvements |
$5M |
2091 |
|
|
|
|
|
US 160 and Piedra Road Intersection Improvements |
$300K |
2092 |
|
|
|
|
|
CDOT’s Region 5 Shoulder Study |
$18.72M |
1490, 2072, 2123 |
|
|
|
|
|
Transit |
Project Cost |
Project ID |
Improving Interstates |
Relieving Traffic |
Improving Rural Access |
Fixing Rural Roads |
Improving Roadway System Condition |
Regional Transit Service between Montrose and Telluride |
$2.12M |
1028 |
|
|
|
|
|
Alamosa Transit Center |
$2.8M |
1309 |
|
|
|
|
|
One-Stop Shop for Transportation for the San Luis Valley |
$1M |
2531 |
|
|
|
|
|
Northeast San Luis Valley Transit Service |
$560K |
2532 |
|
|
|
|
|
Pagosa Springs Transportation Center |
$1.35M |
1326 |
|
|
|
|
|
Bustang Outrider Service between Pagosa Springs and Durango |
$2.69M |
2532 |
|
|
|
|
|
Fixing Rural Roads |
Project Cost |
Project ID |
Improving Interstates |
Relieving Traffic |
Improving Rural Access |
Fixing Rural Roads |
Improving Roadway System Condition |
CO 141 between Naturita and Nucla |
$10.38M |
2633 |
|
|
|
|
|
US 24 between Buena Vista and Granite |
$10.38M |
2631 |
|
|
|
|
|
CO 15 west of La Jara |
$6M |
2636 |
|
|
|
|
|
CO 17 west of Antonito |
$10.38M |
2634 |
|
|
|
|
|
CO 136 east of La Jara |
$2M |
2630 |
|
|
|
|
|
CO 371 between CO 15 and CO 368 |
$2.38M |
2637 |
|
|
|
|
|
CO 151 between Ignacio and Arboles |
$10.38M |
2635 |
|
|
|
|
|
CO 172 between New Mexico to Ignacio |
$10.38M |
2632 |
|
|
|
|
|